28722 - Procedures and Organisation
Faculty / School:
175 - Escuela Universitaria Politécnica de La Almunia
Degree:
423 - Bachelor's Degree in Civil Engineering
ECTS:
6.0
Year:
3
Semester:
First semester
Subject Type:
Compulsory
Module:
---

5.1. Methodological overview

The current subject “Construction equipment and methods” is organized into five main groups of activities: two of them run by the teacher (lectures and problems), another carry out by the students and teacher jointly, a forth one consisting of self-study and finally the assessment written test:

  • Lectures: in which the teacher will explain the theorical concepts of the subject topics.
  • Practical sessions: The teacher will explain the practical application on the concepts developed at the theorical lectures, resolving practical problems. This session will take place at the classroom or at the computer laboratory.
  • Tutorship practical sessions: in which the students will resolve, individually or in groups of two of them, the practical applications of concepts detailed in above paragraphs. Depending on the duration of these practices it can be only initiated at class time and later on finished as a non-class activity bases.
  • Assessment written test: Students will demonstrate the knowledge gained through two not mutually exclusive methods. One by continuing assessment throughout the course or, if these midterms tests are not passed successfully, a global written test on two calls.
  • Personal study: Non-class activities in which students have to study the topics learnt at the class activities in order to understand and assimilate the theory taught in lectures and train the practical cases solved in the practical classes and prepare the written test.

Besides these activities there will be individual tutorials based on personalized attention by the teacher in order to help and resolve doubts and questions about the specific areas in which students have found more difficulties to be understood.

5.2. Learning tasks

To the activity groups mentioned at the previous section the following workload has been assigned:

  • Lectures / Theoretical classes                     25 hours          
  • Practical classes                                        12 hours          
  • Tutorship practical sessions                                   14 hours          
  • Assessment written test                             9 hours
  • Personal study                                          90 hours                      

According this hours distribution a total 150 hours workload is reached, corresponding to the 6 credits ECTS that the subject has assigned during the second quarter of the third course of the Civil Engineer Bachellor´s degree.

These 150 hours involve 15 week of class.

Individual tutorials are planned in a two hours per week basis.

5.3. Syllabus

To reach the subject aims, this one is structured in 18 topics grouped into 3 educational units.

The detailed content of these topics is as follows:

 

EDUCATIONAL UNIT I:          EARTHMOVING.  GENERAL ASPECTS

 

 

TOPIC 1.       EARTHMOVING MACHINERY

 

1.1.       Earthmoving

1.2.       Earthmoving basic operations and machinery

1.2.1.           Excavation o arranque

1.2.2.           Loading

1.2.3.           Hauling and dumping

1.2.4.           Grading

1.2.5.           Wetering or drying

1.2.6.           Compaction

1.2.7.           Refining

1.3.       Land classification according their harness

1.4.       Advantages and limitations of the earthmoving machines

1.5.       Machinery election

1.6.       Mechanization of a work

 

TOPIC 2.       EARTHWORKS QUANTITIES

 

2.1.       Earth volumes changes

2.2.       Swelling and swelling factor

2.3.       Consolidation and compaction

2.4.       Swelling values

2.5.       Practical considerations in soil layers extention

2.6.       Land clearing and land filling.

2.7.       Land movement cuttings and landfills

2.8.       Cross sections areas

2.9.       Determing the mass to be moved between two profiles

2.10.    Mass diagram

2.11.    Soil compensation

 

TOPIC 3.       MACHINE POWER REQUIREMENTS

 

3.1.       Required power

3.1.1.           Available power

3.1.2.           Usable power

3.2.       Balance between available and usable powers

3.3.       Resistance to the power

3.3.1.           Rolling resintance

3.3.2.           Slope resistance

3.3.3.           Acceleration resistence

3.3.4.           Air resistance

3.3.5.           Other resistances

3.4.       Speed calculation. Equation of motion.

3.5.       Practical exercises

 

TOPIC 4.       PRODUCTION AND COST OF THE MACHINERY

 

4.1.       Costing of the work unit

4.2.       Definition of production

4.2.1.           Time efficiency

4.2.2.           Production cycle

4.2.3.           Practical exercises on calculation of production

4.3.       Cost of using machinery

4.3.1. General considerations

4.3.2. Variables to consider

4.3.3. Cost structure

4.3.3.1.            Ownership cost

4.3.3.2.            Operating cost

4.3.3.3.            Total cost

4.3.4. Calculating the direct cost

4.3.5. Using SEOPAN tables

4.3.6. Practical exercises on costing

 

TOPIC 5.       MECHANICS & MACHINERY MAINTENANCE

 

5.1.       Diesel engines

5.1.1.           Overview

5.1.2.           Extra engine feeding

5.1.3.           Power and torque of an engine

5.2.       Gear systems

5.2.1.           Direct gear

5.2.2.           Hydraulic gear

5.3.       Running assembly

5.3.1.           Wheel assembly

5.3.2.           Crawler assembly

5.4.       Lubricants

5.4.1.           Lubrication aims

5.4.2.           Oils

5.4.3.           Additives

5.4.4.           Specific oils

5.4.5.           Greases

5.5.       Filters

5.5.1.           Funtionality

5.5.2.           Types of filters

5.5.3.           Using filters

 

 

 

EDUCATIONAL UNIT II:       EARTHWORKS PROCEDURES

 

 

TOPIC 6.       EXCAVATION AND PUSHING:  DOZER

 

6.1.       Models and scope

6.2.       Mechanical properties

6.3.       Working elements

6.4.       Production cycle

6.5.       Working capabilities

6.6.       Excavation and pushing distances

6.7.       Calculating dozer production

6.8.       Excavation and pushing techniques

6.9.       Ripping techniques

6.10.    Practical exercises

 

TOPIC 7.       EXCAVATION AND LOADING: FRONT LOADER

 

7.1.       Definition, types and applications

7.2.       Front loader elements and working equipment

7.3.       Characteristic parameters

7.4.       Working cycle

7.5.       Buckets

7.6.       Calculating front loader production

7.7.       Match factor

7.8.       Practical exercises

 

TOPIC 8.       EXCAVATION, LOADING AND HAULING: SCRAPERS

 

8.1.       Scraper funtions

8.2.       Scrapers types and fields of application

8.3.       Scraper elements and working equipment

8.4.       Production cycle

8.5.       Excavation methods

8.6.       Different ways of working

8.6.1.           Pushing with a dozer

8.6.2.           Elevation blades

8.6.3.           Push  & Pull

8.7.       Working tips

8.8.       Calculating scraper production

8.9.       Match factor

8.10.    Practical exercises

 

TOPIC 9.       EXCAVATION MACHINERY: EXCAVATORS

 

9.1.       Definition, types and applications

9.2.       Hydraulic excavators

9.2.1.           Classification

9.2.2.           Elements and working equipment

9.2.3.           Excavation methods

9.2.4.           Calculating hydraulic excavator production

9.3.       Cable excavators

9.3.1.           Classification

9.3.2.           Dragline: description and working cycle

9.3.3.           Stationary draglines: description and working cycle

9.4.       Practical exercises

 

TOPIC 10.    HAULING: TRUCKS AND DUMPERS

 

10.1.    Typology

10.2.    Dump trucks

10.3.    Dump semi-trailers

10.4.    Dumpers

10.5.    Off-road dumpers: rígid frame and articulated rear-dump trucks

10.6.    Dump bodies

10.7.    Hauling cycle and match factor

10.8.    Calculating dumpers production

10.9.    Practical exercises

 

TOPIC 11.    FINISHING EQUIPMENT: GRADERS

 

11.1.    Definition and field of aplications

11.2.    Grader elements

11.3.    Working equipment

11.4.    Grader operations

11.5.    Calculating grader production

11.6.    Practical exercises

 

TOPIC 12.    COMPACTION

 

12.1.    Types of compacting equipment

12.2.    Compacting diagram

12.3.    Compacting methods

12.4.    Factors affecting compactiion

12.5.    Compaction specification and control

12.6.    Compaction tests

12.7.    Calculating compaction production

12.8.    Compaction tips

12.9.    Selecting a compactor

12.10.                        Practical exercises

 

 

EDUCATIONAL UNIT III:     OTHER ENGINNERING WORKS PROCEEDING

 

 

TOPIC 13.    ANCILLARY EQUIPMENT

 

13.1.    Electric generator

13.2.    Air compressors and hammers

13.3.    Equipment for pumping water

13.4.    Gas cutting procedures

13.5.    Welding procedures

 

TOPIC 14.    EXPLOSIVES AND BLASTING

 

14.1.    Explosive characterisctics

14.2.    Types of explosives

14.2.1.       Gelatinous explosives

14.2.2.       Powder explosives

14.2.3.       Anfos

14.2.4.       Hidrogels

14.2.5.       Emulsions

14.2.6.       Heavy Anfo

14.3.    Selecting the explosive

14.4.    Initiating systems

14.4.1.       Safety fuse

14.4.2.       Electric detonators

14.4.3.       Detonating cords

14.4.4.       Primers and boosters

14.4.5.       Blasting machine

14.5.    Electric firing

14.5.1.       Types of connections

14.5.2.       Tests before blasting

14.5.3.       Firing

14.6.    Open air blasting

14.6.1.       Forma de rotura

14.6.2.       Factores a tener en cuenta

14.6.3.       Bench blasting

14.6.4.       Contour blasting

14.6.5.       Pre split holes

14.6.6.       Top stem

14.7.    Tunel blasting

 

TOPIC 15.    AGGREGATE PRODUCTION

 

15.1.    General information:

15.2.    Aggegate production machiney

15.2.1.       Jaw crushers

15.2.2.       Impact and gyratory crushers: single and doble effect

15.2.3.       Roll crushers

15.2.4.       Rod mils

15.3.    Calculating aggregate production

15.4.    Aggregates classification: Screeners

15.5.    Aggregates washing

15.6.    Feeders and belt conveyors

15.7.    Surge piles

15.8.    Facilities

15.9.    Practical exercises

 

TOPIC 16.    FLEXIBLE PAVEMENTS: MACHINERY AND EXECUTION

 

16.1.    Soil stabilization

16.2.    Bituminous coats: prime, tack and seal

16.3.    Aggegate baso r subbase and bituminous coats

16.3.1.       Single coat execution

16.3.2.       Doble coat execution

16.3.3.       Tack couts

16.4.    Bituminous concrete

16.4.1.       Heat bituminous plants

16.4.2.       Cold bituminous plants

16.4.3.       Asphalt laying machines and compaction equipment (execution)

16.4.4.       Requirements and quality tests

 

TOPIC 17.    CONCRETE: EQUIPMENT AND PLACING

 

17.1.    Concrete mixers

17.1.1.       Concrete mixing techniques

17.1.2.       Concrete drump / gravity mixer type

17.1.3.       Concrete pan mixer type

17.1.4.       Concrete mixer truck

17.1.5.       Discharge belts / concrete mixer supply

17.2.    Concrete plants

17.3.    Execution: Concrete pumping

17.3.1.       Pumping concrete mixture composition

17.3.2.       Pumping

17.3.3.       Concrete pumps machinery

17.4.    Execution: Consolidating and finishing

17.4.1.       Techniques

17.4.2.       Types and features

17.4.3.       Vibrationing equipment: rods, rules, tables.

17.4.4.       Finishing machines

17.4.5.       Cutting concrete joints

17.5.    Execution: Concrete pavements

17.6.    Execution: Shotcrete

17.6.1.       Shotcrete mixture composition

17.6.2.       Shotcrete equipment

17.6.3.       Shotcrete usage

 

TOPIC 18.    TIMBERING, FORMWORK AND FALSEWORK

 

18.1.    Timbering

18.1.1.       Characteristics

18.1.2.       Types

18.1.3.       Usage

18.2.    Formwork

18.2.1.       Classification

18.2.2.       Materials

18.2.3.       Execution

18.3.    Falsework

 

TOPIC 19.    CRANES AND LIFTING SYSTEMS

 

19.1.    Introduction

19.2.    Mayor cranes types

19.3.    Mobil cranes:

19.3.1.       Telescoping-boom truck mounted, crawler and lattice-boom cranes

19.3.2.       Components

19.3.3.       Lifting capacities diagrams

19.3.4.       Practical exercise

19.4.    Tower cranes

19.4.1.       Components

19.4.2.       Support basement

19.4.3.       Movements and rigging

19.4.4.       Features

19.4.5.       Practical exercise

5.4. Course planning and calendar

The theorical and practical workload of the different topics is distributed according the table below:

 

N

TOPIC

T

P

PT

E

TI

TOTAL

1

EARTHMOVING MACHINERY

2

 

 

 

1

3

2

EARTHWORKS QUANTITIES

1

2

2

 

5

10

3

MACHINE POWER REQUIREMENTS

1

1

1

 

5

8

4

PRODUCTION AND COST OF THE MACHINERY

1

1

1

 

5

8

5

MECHANICS & MACHINERY MAINTENANCE

1

 

 

 

4

5

EU I

Written assessment test EU I

 

 

 

2

 

2

6

EXCAVATION AND PUSHING:  DOZER

1

1

1

 

5

8

7

EXCAVATION AND LOADING: FRONT LOADER

1

1

1

 

5

8

8

EXCAVATION, LOADING AND HAULING: SCRAPERS

1

1

1

 

6

9

9

EXCAVATION MACHINERY: EXCAVATORS

1

1

1

 

5

8

10

HAULING: TRUCKS AND DUMPERS

1

 

1

 

6

8

11

FINISHING EQUIPMENT: GRADERS

1

1

1

 

5

8

12

COMPACTION

2

1

 

 

6

9

EU II

Written assessment test EU II

 

 

 

2

 

2

13

MEDIOS AUXILIARES

1

 

1

 

4

6

14

ANCILLARY EQUIPMENT

2

1

1

 

5

9

15

EXPLOSIVES AND BLASTING

1

1

1

 

4

7

16

AGGREGATE PRODUCTION

2

 

 

 

4

6

17

FLEXIBLE PAVEMENTS: MACHINERY AND EXECUTION

3

 

 

 

7

10

18

CONCRETE: EQUIPMENT AND PLACING

1

 

1

 

4

6

19

TIMBERING, FORMWORK AND FALSEWORK

1

 

 

 

4

5

EU III

Written assessment test EU III

 

 

 

2

 

2

 

Final written assessment test

 

 

 

3

 

3

 

TOTAL

25

12

14

9

90

150

 

S.-            Theorical sesions / lectures

P.-            Practical sesions /Problems

PT.-          Computer lab workshop

E.-            Written assesment test

TI.-           Personal study

DESIGNATION OF SESSIONS ACCORDING TO THE WORKLOAD

 

TOPIC

T

P

PT

E

0

SUBJECT INTRODUCTION AND LEARNING AIMS

S-011

 

 

 

1

EARTHMOVING MACHINERY

S-111

 

 

 

2

EARTHWORKS QUANTITIES

S-211

P-212

P-222

PT-212

PT-222

 

3

MACHINE POWER REQUIREMENTS

S-311

P-311

PT-311

 

4

PRODUCTION AND COST OF THE MACHINERY

S-411

P-411

PT-411

 

5

MECHANICS & MACHINERY MAINTENANCE

S-511

 

 

 

UD I

Written assessment test EU I

 

 

 

EV-I-1

EV-I-2

6

EXCAVATION AND PUSHING:  DOZER

S-611

P-611

PT-611

 

7

EXCAVATION AND LOADING: FRONT LOADER

S-711

P-711

PT-711

 

8

EXCAVATION, LOADING AND HAULING: SCRAPERS

S-811

P-811

PT-811

 

9

EXCAVATION MACHINERY: EXCAVATORS

S-911

P-911

PT-911

 

10

HAULING: TRUCKS AND DUMPERS

S-1011

 

PT-1011

 

11

FINISHING EQUIPMENT: GRADERS

S-1111

P-1111

PT-1111

 

12

COMPACTION

S-1212

S-1222

P-1211

 

 

UD II

Written assessment test EU II

 

 

 

EV-II-1

EV-II-2

13

MEDIOS AUXILIARES

S-1311

 

PT-1311

 

14

ANCILLARY EQUIPMENT

S-1412

S-1422

P-1411

PT-1411

 

15

EXPLOSIVES AND BLASTING

S-1511

P-1511

PT-1511

 

16

AGGREGATE PRODUCTION

S-1612

S-1622

 

 

 

17

FLEXIBLE PAVEMENTS: MACHINERY AND EXECUTION

S-1713

S-1723

S-1733

 

 

 

18

CONCRETE: EQUIPMENT AND PLACING

S-1811

 

PT-1811

 

19

TIMBERING, FORMWORK AND FALSEWORK

S-1911

 

 

 

UD III

Written assessment test EU III

 

 

 

EV-III-1

EV-III-2

 

Final written assessment test

 

 

 

EV-F-1

EV-F-2

EV-F-3

 

TOTAL

25

12

14

9

 

(Eg. Designation meaning:   PT-1723.-  Theorical session corresponding to the topic 17, sesión 2 of 3)

CALENDAR

 

 

HOUR

LECTURES

PRACTICAL

TUTORIAL

SESSIONS

ASSESSMENT

WRITTEN

TEST

1

S-011

 

 

 

2

S-111

 

 

 

3

S-211

 

 

 

4

 

P-212

 

 

5

 

 

PT-212

 

6

 

P-222

 

 

7

 

 

PT-222

 

8

S-311

 

 

 

9

 

P-311

 

 

10

 

 

PT-311

 

11

S-411

 

 

 

12

 

P-411

 

 

13

 

 

PT-411

 

14

S-511

 

 

 

15

 

 

 

EV-I

16

 

 

 

EV-I

17

S-611

 

 

 

18

 

P-611

 

 

19

 

 

PT-611

 

20

S-711

 

 

 

21

 

P-711

 

 

22

 

 

PT-711

 

23

S-811

 

 

 

24

 

P-811

 

 

25

 

 

PT-811

 

26

S-911

 

 

 

27

 

P-911

 

 

28

 

 

PT-911

 

29

S-1011

 

 

 

30

 

 

PT-1011

 

31

S-1111

 

 

 

32

 

P-1111

 

 

33

 

 

PT-1111

 

34

S-1212

 

 

 

35

S-1222

 

 

 

36

 

P-1211

 

 

37

 

 

 

EV-II

38

 

 

 

EV-II

39

S-1311

 

 

 

40

 

 

PT-1311

 

41

S-1412

 

 

 

42

S-1422

 

 

 

43

 

P-1411

 

 

44

 

 

PT-1411

 

45

S-1511

 

 

 

46

 

P-1511

 

 

47

 

 

PT-1511

 

48

S-1612

 

 

 

49

S-1622

 

 

 

50

S-1713

 

 

 

51

S-1723

 

 

 

52

S-1733

 

 

 

53

S-1811

 

 

 

54

 

 

PT-1811

 

55

S-1911

 

 

 

56

 

 

 

EV-III

57

 

 

 

EV-III

58

 

 

 

EV-F-1

59

 

 

 

EV-F-1

60

 

 

 

EV-F-1

5.5. Bibliography and recommended resources

Basic bibliography

  • Procedimientos generales de construcción: Movimiento de tierras (ETS ICCP; Juan Tiktin)
  • Valoración de obras en Ingeniería Civil (UPM EUITOP; Gonzalo de Fuentes Bescós)
  • Procedimientos generales de construcción: Procesamiento de áridos  y puesta en obra del hormigón (ETS ICCP; Juan Tiktin)
  • PG-3 (Pliego de prescripciones técnicas generales para obras de carreteras y puentes; Ministerio de Fomento)
  • Apuntes de sistemas de elevación .Grúas (ETS ICCP Madrid ; Miguel Flórez de la Colina y José Flórez Alía)
  • Manual de empleo de explosivos (ANFEX; Ministerio de Industria, turismo y comercio; ISBN 84-605-0873)

                       

Complementary bibliography

  • Maquinaria de construcción (Manuel Díaz del Río)
  • Encargado de obra: Encofrados y entibaciones (Ed. Tornapunta; Pedro Serralta González)
  • Manual de costes de maquinaria (ANCOP) (preferible Edición 2008)
  • Manual de movimientos de tierra a cielo abierto(Fueyo Editores; Julián Rojo López)
  • Camiones de obra (Jose María del Campo Yagúe)
  • Cargadoras (Jose María del Campo Yagúe)
  • Tractores de cadenas (Jose María del Campo Yagúe)
  • Motoniveladoras (Jose María del Campo Yagúe)
  • Movimiento de tierras. Coste. Alquiler. Mantenimiento (Jose María del Campo Yagúe)
  • Maquinaria y métodos modernos de construcción (Belisco e hijos; Frank Harris)
  • Firmes y pavimentos  (Colección Escuelas CICCP; Carlos Kraemer y Miguel Angel del Val)